INSTALLATION GUIDE
ITEMS USED PER 8’ SECTION (6’ Tall)
BEFORE YOU BEGIN
TOOLS NEEDED
STEP 1: DETERMINE INSTALL METHOD FOR UNEVEN TERRAIN
Stakes
Pencil
String line
Tape measure
12” Miter Saw (Recommended)
Circular Saw
Shovel or post hole digger
Drill
Wheel Barrow
4 ft Level
Hammer
Spray Paint
2” Finish Nails / Nail Gun or
Composite Screws
Speed square
1-5/8” Fence Screws
>> Confirm location of underground utilities with local providers before you dig.
>> Check local zoning laws, which may regulate the size and placement of your fence.
>> Apply for local permit as directed by local code.
A
B
C
D
E
F
G
1 Post Cap
1 Post
4 Brackets
1 Top Rail
19 Pickets
2 Bottom Rail Covers
1 Aluminum Bottom Rail
A
B
C
D
E
F
G
A
1
For uneven terrain, determine which method you will use to install your
panels:
This fence gradually “steps” up the slope so that each
section is the same length and the rails remain level. You will need to
fill in the gap below the fence with soil. The downhill post will need to
be set taller to allow attachment of the upper rail. Taller posts may be
required. When laying out fence (STEP 2) spacing between posts
must be measured horizontally and not parallel to the ground.
2
This fence follows the grade or slope with the rails
parallel to the ground. Taller posts are not required but the horizontal
post spacing may need to be reduced to avoid rails being too short.
(Consult the chart in STEP 2 for proper spacing). Miter cut rails to fit
grade. On extreme slopes pickets may require cutting.
3
STEP METHOD:
SLOPING METHOD:
A fence can be easily transitioned to a different height.
Horizontal post spacing will need to be reduced (see fig.3 in STEP 2)
and top rail will need to be miter cut. Pickets will require cutting.
TRANSITION:
1
2
3
©2013 TFSC
Page view 0
1 2 3 4 5

Summary of Contents

Page 1 - INSTALLATION GUIDE

TREX SECLUSIONS ®INSTALLATION GUIDEITEMS USED PER 8’ SECTION (6’ Tall)BEFORE YOU BEGINTOOLS NEEDEDSTEP 1: DETERMINE INSTALL METHOD FOR UNEVEN TERRAIN□

Page 2

TREX SECLUSIONS ®INSTALLATION GUIDESTEP 2: LAY OUT FENCE LINEPropertyPropertypinStakes ForFence LinesHolesMarking For Digging Post HolesPropertypinPo

Page 3 - Advanced Tips and Tricks:

75”75”TREX SECLUSIONS ®INSTALLATION GUIDESTEP 5: CUT POSTS TO HEIGHT (IF POSTS ARE NOT SET TO HEIGHT) 75”74-1/8”6-1/2”Ex. If the drop measured above

Page 4

Advanced Tips and Tricks:TREX SECLUSIONS ®INSTALLATION GUIDESTEP 7: CUT & INSTALL BOTTOM RAILSSTEP 8: CUT TOP RAILAMeasure between the post or f

Page 5

TREX SECLUSIONS ®INSTALLATION GUIDESTEP 10: INSTALL TOP RAILSTEP 11: INSTALL POST CAPSAReplace the top rail you set aside in STEP 8 by setting the t